Valjevo’s city administration has authorised temporary traffic arrangements on municipal roads and streets affected by a steel distribution gas pipeline project. A local notice published November 13, 2026 identifies the contractor as DM-INVEST of Smederevska Palanka.
Where the work will take place
The affected cadastral districts are Kozličić, Brankovina, Zabrdica, Grabovica, Rađevo Selo, Kotešica and Rabas. The permitted period runs from November 10, 2026 through June 1, 2027, with measures introduced in phases rather than across every road simultaneously.
What changes on the roads
Some sections may use one lane with alternating traffic flows; temporary speed limits of 30 or 50 km/h may apply depending on the works. The contractor must maintain a pedestrian passage at least one metre wide and notify households when trenches affect entry to or exit from their property.
Requirements for the contractor
Drivers should follow the signs and the latest local notices. The overall authorised date range does not mean that every village road will remain blocked until June.
Source: Ugradu.info — Valjevo, 13 Nov 2026.
Serbian original: SrbijaNews — sr.
Sources & corrections
SRBIJA NEWS identifies sources and updates information when available. If you notice an error or can provide verified local information, please contact the newsroom.
Send a correction or update